Infrared Home Sauna Installation



Step 1

Place the bottom board in the desired location of your sauna. The sauna will be assembled on top of it. Then place the front panel with door (section 3) on the front of the bottom panel.



Step 2
Place the left side wall (section 7) on the bottom, lift it in order to make the two pieces of pothooks lock on the corresponding slots on the front panel, then put it down; after that, fix the left side wall with bottom panel by the special latching system.


Step 3
Locate back wall (section 8) and attached to the left side wall section 7) with the special latching system. Locate right wall on the bottom panel, lift it to make its pothooks lock on the corresponding slots of the front wall, then press it down securing the wall in place; after that, secure it to the back wall by latching system on the other side.


Step 4
Locate bench front with heating element and slide it down vertically into the slot located on the inside wall. Next, connect the bench's heater element wire to corresponding wire from the back wall, then locate seat top (section 6) and slide into place.

 



Step 5
Locate the wall panel wiring and drape outside the completed unit to make room for installation of the ceiling. These wires will be flipped back after the ceiling is in place. Then connect before the roof panel is put on.

Locate section 9 (ceiling panel), rise above the walls and set in place to complete the enclosure. The ceiling should fit easily.

Flip the wall panel wiring back over the top of the ceiling and recheck all latches to make sure all walls are latched together correctly and tightly .And cotter pins have been installed.

Step 6
Unpack the CD player and Faceplate control from the box. Plug audio wire (CD2) from the Power Board into the back of the CD player. Locate the control panel's main wire A from the Power Board, and attach to the back of the external control panel. Attach the internal control box to the small batten under the CD box .




Step 7

Place the internal top ceiling (section 9) on the completed sauna room to cover all internal wiring.

Congratulations! The installation is completed.